In recent days, MCC5 Group Shanghai Corp. Ltd. and Fives FCB signed the Equipment Fabrication Contract for Mexico TULA2 Cement Production Line Project.
This project is located in Tula Cement Plant of Fortaleza Cement Company in Hidalgo of Mexico. It is generally contracted by French Fives FCB by EPC mode. It is to design a new complete production line on the basis of the existing Tula Cement Plant. MCC5 is mainly responsible for fabrication of about 800t non-standard equipment of preheating tower, transfer station, clinker production workshop and storage workshop, etc. Our company has ever cooperated with German Polysus and French Fives FCB to undertake many cement production line projects. We have international standard fabrication capability and contract performance guarantee system.
The new cement production line is planned to be put into production by the mid of 2016. This project will adopt the latest development technology of Fives FCB in respect of energy saving and environmental protection. The daily output of this cement production line will reach 3300t to further meet with the increasing demand of Mexico.(Reported by: Chen Kewen)